Which of the following statements is one of the five Lean Thinking principles?
- A. Identify the Value Stream for each product
- B. Customer collaboration over contract negotiation
- C. Deliver working software frequently
- D. Decentralize decision-making
Answer: A
Explanation:
Explanation
Identifying the Value Stream for each product is one of the five Lean Thinking principles proposed by Womack and Jones in 1996. A value stream is the sequence of activities that deliver value to the customer, from the initial request to the final delivery1. Identifying the value stream for each product helps to eliminate waste, optimize flow, and increase customer satisfaction2.
References:
*The Five Principles of Lean - Project Management Institute
*Value Streams - Scaled Agile Framework
NEW QUESTION # 20
Which of the following Agile Manifesto principles aligns with conducting a System Demo?
- A. Welcome changing requirements, even late in development
- B. The team reflects on how to become more effective at regular intervals
- C. Working software is the primary measure of progress
- D. The best way to convey information is a face-to-face conversation
Answer: C
Explanation:
Explanation
The System Demo is an event where the Agile Release Train (ART) demonstrates the integrated and working software to the stakeholders and customers1. The System Demo aligns with the Agile Manifesto principle that states: "Working software is the primary measure of progress"2. This principle emphasizes the value of delivering functional and usable software over comprehensive documentation or adherence to a plan3. The System Demo provides feedback on the quality, usability, and value of the software, as well as the effectiveness of the ART1.
References:
*System Demo - Scaled Agile Framework
*12 Principles Behind the Agile Manifesto | Agile Alliance
*Manifesto for Agile Software Development
NEW QUESTION # 21
What is one way Kanban boards are used in SAFe?
- A. To manage PI Objectives
- B. To manage WIP limits
- C. To manage non-functional requirements (NFRs) in the backlog
- D. To manage individual performance
Answer: B
Explanation:
Explanation
One way Kanban boards are used in SAFe is to manage Work-In-Progress (WIP) limits. WIP limits are the maximum number of work items that can be in a given state or column of the Kanban board at any time. They help to prevent bottlenecks, reduce waste, improve flow, and increase quality and predictability. WIP limits are applied at every level of the SAFe framework, from the portfolio to the team, to optimize the value delivery123 References:
*SAFe Team Kanban - Scaled Agile Framework
*Applying Kanban in SAFe - Scaled Agile Framework
*What is one way Kanban boards are used in SAFE? a. To manage runway ...
NEW QUESTION # 22
What is one input to the Vision?
- A. Feature context
- B. Team topologies
- C. Customer feedback
- D. Portfolio Backlog
Answer: C
Explanation:
Explanation
One input to the Vision is customer feedback. Customer feedback is the information and opinions that customers and stakeholders provide about the solution, its features, and its value proposition1. Customer feedback helps to validate the assumptions, test the hypotheses, and measure the satisfaction of the solution2.
Customer feedback also helps to identify the needs, preferences, and expectations of the customers and stakeholders, which are essential for defining and communicating the Vision3. The Vision is a description of the future state of the solution under development, and it reflects the problem(s) that the solution will solve and the benefits that it will deliver4.
References:
*Customer Feedback - Scaled Agile Framework
*Continuous Exploration - Scaled Agile Framework
*Solution Vision - Scaled Agile Framework
*Vision - Scaled Agile Framework
NEW QUESTION # 23
Why is the problem-solving workshop more effective than traditional lessons learned documents?
- A. It involves a small group of leaders
- B. It makes improvements actionable through backlog items for the next PI
- C. Workshops are more engaging than document writing
- D. Collaboration over documentation is a key recommendation of the Agile Manifesto
Answer: B
Explanation:
Explanation
The problem-solving workshop is more effective than traditional lessons learned documents because it makes improvements actionable through backlog items for the next Program Increment (PI). A problem-solving workshop is a structured approach to identify and solve problems that affect the performance and quality of the Agile Release Train (ART) or Solution Train1. Unlike traditional lessons learned documents, which are often passive and rarely implemented, a problem-solving workshop results in a set of improvement backlog items that are prioritized and planned for the next PI2. This way, the teams can implement the improvements and measure their impact on the value delivery3.
References:
*Inspect and Adapt - Scaled Agile Framework
*Why is the problem-solving workshop more effective than traditional ...
*Problem-solving workshop: Step-by-Step - Agilephoria
NEW QUESTION # 24
What system delivers a product or service to a Customer?
- A. Development Value Stream
- B. Kanban System
- C. Dual Operating System
- D. Operational Value Stream
Answer: D
Explanation:
Explanation
An Operational Value Stream (OVS) is the sequence of activities needed to deliver a product or service to a customer1. Examples include manufacturing a product, fulfilling an order, admitting and treating a medical patient, providing a loan, or delivering a professional service1. An OVS is the system that delivers value to the customer and generates revenue for the enterprise2. In SAFe®, OVSs are the primary focus of the Customer Centricity competency, which aims to understand and meet the needs and expectations of the customer3.
Some additional information that might be helpful for you are:
*The other options (A, C, and D) are not systems that deliver a product or service to a customer, but rather systems or concepts that support or enable the delivery of value.
*A Kanban System is a method of visualizing and managing the flow of work in a value stream4. A Kanban System can be applied to any type of value stream, whether operational or developmental, to improve efficiency, quality, and predictability4.
*A Development Value Stream (DVS) is the sequence of activities needed to convert a business hypothesis into a digitally-enabled solution that delivers customer value. A DVS is the system that develops and supports the solutions used by the OVSs. In SAFe®, DVSs are the primary focus of the Agile Product Delivery competency, which aims to continuously explore, integrate, deploy, and release value.
*A Dual Operating System is a concept proposed by John Kotter that describes the need for organizations to balance the traditional hierarchical structure with a more agile and networked structure. A Dual Operating System enables organizations to exploit their existing capabilities while exploring new opportunities for innovation and growth. In SAFe®, a Dual Operating System is achieved by applying the Lean-Agile Leadership competency, which fosters a culture of learning and empowerment.
NEW QUESTION # 25
What does a Kanban board demonstrate?
- A. The accumulated value of a team's work
- B. Where a team has too much work-in-process (WIP)
- C. A burndown chart of work completed in the Iteration
- D. The cost of delay of each item on the board
Answer: B
Explanation:
Explanation
A Kanban board is a visual tool that helps teams manage the flow of work from start to finish. It shows the steps of the team's workflow, the work items in each step, and the work-in-process (WIP) limits for each step1. A Kanban board demonstrates where a team has too much work-in-process (WIP), which is the number of work items that are being worked on at any given time. Having too much WIP can cause delays, bottlenecks, and waste in the value stream2. By using a Kanban board, teams can identify and resolve the sources of excessive WIP, and optimize their flow and throughput3.
References:
*SAFe Team Kanban - Scaled Agile Framework
*Applying Kanban in SAFe - Scaled Agile Framework
*What is a Kanban Board, and How Do You Use It? - How-To Geek
NEW QUESTION # 26
What is essential when communicating the Vision?
- A. The importance of Feature prioritization
- B. The importance of Lean budget Guardrails
- C. The importance of non-functional requirements
- D. The importance of empathy interviews
Answer: B
Explanation:
Explanation
The vision is a description of the future state of the solution under development, reflecting customer and stakeholder needs, as well as the features and capabilities proposed to meet those needs1. Communicating the vision effectively is essential for creating a shared understanding of the program's goals and objectives, especially as they evolve due to changing market needs and business drivers1. One of the key aspects of communicating the vision is to establish the importance of Lean budget Guardrails, which are policies and practices that ensure the financial integrity and economic viability of the solution2. Lean budget Guardrails provide the boundaries and context forthe solution development, enabling decentralized decision-making and empowering teams to operate autonomously within the agreed-upon funding2. By communicating the importance of Lean budget Guardrails, the vision helps align the teams with the strategic themes and portfolio priorities, as well as foster a culture of innovation and learning2.
References: 1 Vision - Scaled Agile Framework, 2 Lean Budgets - Scaled Agile Framework
NEW QUESTION # 27
What unit of time is used on Solution Roadmaps?
- A. Iterations
- B. PIs
- C. Years
- D. Days
Answer: B
Explanation:
Explanation
Program Increments (PIs) are the unit of time used on Solution Roadmaps, which are visual tools that forecast and communicate the planned deliverables, milestones, and investments over a time horizon12. PIs are fixed-length timeboxes, typically 8 to 12 weeks long, that provide a regular and predictable planning cadence for the Agile Release Trains (ARTs) and Solution Trains3. PIs are used on Solution Roadmaps to:
*Align the solution delivery with the PI objectives, which are the SMART goals that define the expected outcomes and benefits for each ART and Solution Train in a PI3.
*Coordinate the dependencies and interfaces between the ARTs and Solution Trains that contribute to the solution3.
*Provide a near-term forecast of the features and capabilities that will be delivered in the next two to three PIs12.
*Incorporate feedback and learning from the previous PIs and adjust the scope and priority of the work items as needed12.
Some additional information that might be helpful for you are:
*The other options (A, B, and D) are not the unit of time used on Solution Roadmaps, but rather units of time that may be used for other purposes or in other contexts.
*Iterations are fixed-length timeboxes, typically one or two weeks long, that provide a regular and predictable development cadence for the Agile Teams4. Iterations are used to plan, execute, and demo the work items in the Team Backlog4.
*Years are a unit of time that may be used to provide a high-level overview of the roadmap, outlining major milestones, goals, and initiatives that are planned over multiple years2. Years are not used to plan or forecast the solution delivery in detail, as they are too long and uncertain for Agile planning2.
*Days are a unit of time that may be used to estimate the effort or duration of a work item or a task5. Days are not used to schedule or forecast the solution delivery on the roadmap, as they are too granular and variable for Agile planning5.
NEW QUESTION # 28
What is one method for designing the end-to-end Customer experience?
- A. Whole-product thinking
- B. Feature storming
- C. Journey mapping
- D. Persona development
Answer: C
Explanation:
Explanation
Journey mapping is one method for designing the end-to-end customer experience. It is a visual representation of the steps, emotions, and pain points that a customer goes through when interacting with a product or service. It helps to identify the customer needs, expectations, and goals, as well as the gaps and opportunities for improvement in the current experience. Journey mapping also helps to align the stakeholders on the customer perspective and prioritize the features and solutions that will deliver the most value and satisfaction123 References:
*The expanding role of design in creating an end-to-end customer experience
*End to End Customer Experience: Know and Control its 3 Elements - HEFLO BPM
*How Design thinking Can Shape end to end Customer Experience
NEW QUESTION # 29
What are the minimum requirements for a Feature?
- A. Benefit hypothesis, acceptance criteria, and priority
- B. Acceptance criteria, data models, and priority
- C. Name, benefit hypothesis, and acceptance criteria
- D. Non-functional requirements, data models, and architecture
Answer: C
Explanation:
Explanation
The minimum requirements for a feature are a name, a benefit hypothesis, and acceptance criteria12. A name is a brief and descriptive phrase that summarizes the feature. A benefit hypothesis is a statement that describes the expected outcome and value of the feature for the customer or user. Acceptance criteria are a set of conditions that the feature must satisfy to be accepted by the customer or stakeholder12.
Some additional information that might be helpful for you are:
*The other options (A, C, and D) are not the minimum requirements for a feature, but rather additional or optional elements that may be included in the feature definition.
*Data models are representations of the data structures and relationships that the feature requires or affects.
Data models are not mandatory for a feature, but they may be useful for complex or data-intensive features3.
*Priority is the relative importance or urgency of a feature compared to other features. Priority is not a requirement for a feature, but it is a factor that influences the feature selection and sequencing4.
*Non-functional requirements (NFRs) are system qualities that guide the design of the solution and often serve as constraints across the relevant backlogs. NFRs are not specific to a feature, but they may affect the feature implementation or testing5.
*Architecture is the design and structure of the system that supports the solution. Architecture is not a requirement for a feature, but it is an enabler that facilitates the feature delivery.
NEW QUESTION # 30
What increases the effectiveness of System Demos?
- A. Focus on team-level Metrics
- B. Limit team attendance to minimize disruptions to the team
- C. Spend a lot of time preparing for the demo
- D. Consider how and what to demo during Iteration Planning
Answer: D
Explanation:
Explanation
Considering how and what to demo during Iteration Planning increases the effectiveness of System Demos, which are events that provide an integrated view of new features delivered by the Agile Release Train (ART) in each Iteration12. By thinking ahead of how and what to demo, the teams can:
*Align on the product vision and roadmap and ensure that the work items are aligned with the customer value and the PI objectives12.
*Define clear and testable acceptance criteria for each work item and plan how to verify them in the demo12.
*Identify and resolve any dependencies, risks, or impediments that may affect the demo12.
*Prepare the demo environment and the necessary tools and data to support the demo12.
*Practice the demo and rehearse the script and the roles of the presenters12.
Some additional information that might be helpful for you are:
*The other options (A, B, and C) are not actions that increase the effectiveness of System Demos, but rather actions that may reduce it.
*Spending a lot of time preparing for the demo may not be effective, as it may take away time and focus from the actual development and testing of the work items. Instead, the teams should aim for continuous integration and built-in quality practices that enable them to demo the work items as soon as they are done12.
*Limiting team attendance to minimize disruptions to the team may not be effective, as it may reduce the feedback and collaboration opportunities that the demo provides. Instead, the teams should invite and engage all the relevant stakeholders, such as Business Owners, executive sponsors, other Agile Teams, development management, and customers, to the demo12.
*Focusing on team-level metrics may not be effective, as it may not reflect the true value and progress of the integrated work across the ART. Instead, the teams should focus on system-level metrics, such as PI objectives, solution quality, and customer satisfaction, to evaluate the outcome and impact of the demo12.
NEW QUESTION # 31
In the first step of SAFe's Continuous Delivery Pipeline, Product Owners and Product Managers do what activity?
- A. Hypothesize what would create value for Customers
- B. Ensure the Architecture team has sufficient capacity
- C. Prioritize the Team Backlog
- D. Negotiate Supplier contracts
Answer: A
Explanation:
Explanation
Hypothesizing what would create value for customers is the main activity of Product Owners and Product Managers in the first step of SAFe's Continuous Delivery Pipeline, which is Continuous Exploration (CE)12.
In CE, they use design thinking to understand the market problem or customer need and the solution required to meet that need12. They start with a hypothesis of something that will provide value to customers, such as a new feature, capability, or enhancement12. They then validate or invalidate their hypothesis through experimentation, feedback, and learning12.
Some additional information that might be helpful for you are:
*The other options (A, B, and C) are not the main activity of Product Owners and Product Managers in the first step of SAFe's Continuous Delivery Pipeline, but rather activities that may occur in other steps or roles.
*Ensuring the Architecture team has sufficient capacity is an activity that may occur in the second step of SAFe's Continuous Delivery Pipeline, which is Continuous Integration (CI)12. In CI, the Architecture team works with the Development teams to ensure the technical quality and integrity of the solution12.
*Negotiating Supplier contracts is an activity that may occur in the fourth step of SAFe's Continuous Delivery Pipeline, which is Release on Demand12. In Release on Demand, the Solution Management team works with the Suppliers to coordinate the release of the solution components that are provided by them12.
*Prioritizing the Team Backlog is an activity that occurs in the Program Increment (PI) Planning event, which is part of the Agile Product Delivery competency3. In PI Planning, the Product Owner works with the Development team and other stakeholders to define, prioritize, and estimate the work items for the upcoming PI3.
NEW QUESTION # 32
What is one benefit of capacity allocation?
- A. It enables effective time-tracking
- B. It allocates developers and testers to an initiative
- C. It prevents different types of backlog items from being compared against each another
- D. It ensures all Value Streams in the Portfolio are appropriately funded
Answer: C
Explanation:
Explanation
Capacity allocation is an allocation of work by work item type for an upcoming planning period1. It helps the Agile Teams to balance their investments across different types of backlog items, such as new features, enablers, defects, and technical debt2. One benefit of capacity allocation is that it prevents different types of backlog items from being compared against each other based on their relative value or priority, which can be misleading or subjective3. Instead, capacity allocation allows the teams to focus on delivering value and quality in each work item type, without compromising the other2.
References:
*Capacity Allocation - Scaled Agile Framework
*Team Backlog - Scaled Agile Framework
*How Does SAFe Handle Capacity Planning and Resource Management? - Value Glide
NEW QUESTION # 33
What makes value available when it's needed?
- A. DevOps
- B. Release on Demand
- C. Infrastructure
- D. Continuous Deployment
Answer: B
Explanation:
Explanation
Release on Demand is the process that makes value available to customers when it's needed. It is the final aspect of the Continuous Delivery Pipeline, which represents the workflows, activities, and automation needed to guide new functionality from ideation to an on-demand release of value1. Release on Demand allows the business to release the solution to the end users or customers in acontrolled or staggered manner, based on the market and business needs2. Release on Demand enables the enterprise to respond quickly to customer feedback, optimize the timing and frequency of releases, and reduce the risk associated with each release3.
References:
*Continuous Delivery Pipeline - Scaled Agile Framework
*Release on Demand - Scaled Agile Framework
*What is Release on Demand? | Definition and Overview
NEW QUESTION # 34
What is one characteristic of writing effective PI Objectives?
- A. Describing the value
- B. Listing out committed Features
- C. Including critical Stories
- D. Identifying significant risks
Answer: A
Explanation:
Explanation
One characteristic of writing effective PI Objectives is describing the value that the objectives will deliver to the customers and stakeholders. PI Objectives are a summary of the business and technical goals that the Agile Release Train (ART) intends to achieve in the upcoming Program Increment (PI)1. They are not just a list of features or stories, but rather a statement of the outcomes and benefits that the features or stories will provide2.
By describing the value, the PI Objectives help align the teams and stakeholders to a shared vision and mission, and provide a basis for measuring the progress and performance of the ART3.
References:
*PI Objectives - Scaled Agile Framework
*Your Guide to Writing Great Iteration and PI Objectives - Scaled Agile
*How to Write PI Objectives - ValueGlide
NEW QUESTION # 35
Which role does Product Management work with to prioritize Enablers?
- A. System Architect
- B. Solution Management
- C. Development Manager
- D. Product Owner
Answer: A
Explanation:
Explanation
Product Management works with System Architect to prioritize Enablers, which are backlog items that extend the architectural runway of the solution under development or improve the performance of the development value stream1. System Architect provides technical guidance and enablement to the Agile Release Trains (ARTs) and helps identify and define the enablers needed to support the features and capabilities2. In collaboration with System Architect, Product Management negotiates capacity allocations that balance the concentration of business and enabler features in the ART backlog3.
Some additional information that might be helpful for you are:
*The other options (B, C, and D) are not the role that Product Management works with to prioritize Enablers, but rather roles that have different responsibilities or collaborations with Product Management.
*Development Manager is a role that supports the Development teams in building quality solutions and fosters a culture of technical excellence and innovation4. Development Manager may work with Product Management to provide feedback on the feasibility and effort of the features and enablers, but not to prioritize them.
*Product Owner is a role that represents the customer and stakeholders to the Development team and defines and accepts the work items in the Team Backlog. Product Owner may work with Product Management to align on the product vision and roadmap and to decompose the features and enablers into stories, but not to prioritize them.
*Solution Management is a role that is responsible for defining and delivering complex solutions that require multiple ARTs and Solution Trains. Solution Management may work with Product Management to coordinate the dependencies and interfaces between the solutions and the products, but not to prioritize the enablers.
NEW QUESTION # 36
Which of the following events shows how well the ART is progressing toward meeting the PI Objectives?
- A. PI Planning
- B. Backlog Refinement
- C. PO Sync
- D. Inspect and Adapt
Answer: D
Explanation:
Explanation
The event that shows how well the Agile Release Train (ART) is progressing toward meeting the Program Increment (PI) objectives is the Inspect and Adapt (I&A) event. The Inspect and Adapt event occurs at the end of each PI and provides an opportunity for the entire ART to reflect on the progress made during the PI, identify and address the root causes of any impediments, and plan for improvement actions in the next PI1.
*Inspect and Adapt - Scaled Agile Framework
NEW QUESTION # 37
......
Focus on SAFe-POPM All-in-One Exam Guide For Quick Preparation: https://dumpsvce.exam4free.com/SAFe-POPM-valid-dumps.html